The first steps of this lesson
Step 1: The Rule: Same Lot, Minimum Distances
Section H 101.8 of 2025 CPC Appendix H says no private sewage disposal system, or any part of it, may sit on a lot other than the lot of the building it serves, and none may be closer than the minimum distances in Table H 101.8. The table is the layout test you run on every site plan before you dig. A failing distance is fixed by moving the component or changing the design, not by getting a verbal OK.
Step 2: Read the Table by Column
Table H 101.8 has four component columns: building sewer, septic tank, disposal field, and seepage pit or cesspool. Building or structure: 2, 5, 8, and 8 feet. Property line adjoining private property: clear, 5, 5, and 8 feet. Water supply wells: 50, 50, 100, and 150 feet. Streams and other bodies of water: 50, 50, 100, and 150 feet. Trees: 10 feet for the tank and for a seepage pit. Distribution box: 5 feet for field and pit. Pressure public water main: 10 feet in every column.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.