The first steps of this lesson
Step 1: Where Boiler Combustion Air Is Governed
2025 CMC §1001.3 says air for combustion and ventilation for a boiler shall be provided in accordance with Chapter 7, and §701.1 says air for combustion, ventilation and dilution of flue gases comes from one of the methods in §701.4 through §701.9.3. The sizing rules below are written for natural-draft (Category I) gas appliances; §701.1.1 sends appliances that are not natural draft, are not Category I, or have power burners to the appliance manufacturer's instructions. The input in every calculation is the total input rating, in Btu/h, of all appliances in the space.
Step 2: Test the Room First: Indoor Air
Under the standard method in §701.4.1 the room must provide at least 50 cubic feet per 1000 Btu/h of total input. Where the infiltration rate is known, §701.4.2 allows a smaller volume, but an infiltration rate above 0.60 ACH may not be used, and if the rate is below 0.40 ACH that method must be used. Rooms that open into the boiler room without doors, or through openings sized under §701.5, count as part of the volume; those indoor openings are 1 square inch per 1000 Btu/h, not less than 100 square inches, one within 12 inches of the top and one within 12 inches of the bottom, with a 3-inch minimum dimension.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.