- Platform framing
- A method in which each story is built as its own deck, with wall studs only one story tall standing on the floor below. It gives a flat working surface at every level and creates natural fire stops at each floor.
- Cripple wall
- A short framed wall between the foundation and the first floor, common in older California houses with raised floors. Unbraced cripple walls can rack or collapse in an earthquake, so sheathing and anchorage are standard retrofit items.
- Hold-down anchor
- A steel connector bolted into the foundation and fastened to the end post of a braced wall. It resists the uplift that a lateral force creates, keeping the wall from lifting off its base or overturning during shaking.
- Rough opening
- The framed hole left in a wall for a window or door, sized larger than the unit to leave room for shims, plumb and square adjustments. Reading the manufacturer's rough opening dimensions prevents costly reframing.
- Header
- A beam placed over a door, window or garage opening that carries the load from above across the gap into the jack studs at each side. Its size depends on span and what it supports.
- Fireblocking
- Material such as lumber or mineral wool installed inside concealed wall, floor and soffit cavities to slow flames and hot gases from traveling between stories or into the attic before occupants can leave.
- Weather-resistive barrier
- A building paper or wrap installed behind siding or stucco to shed any water that gets past the cladding. Laps are shingled so water runs out over the layer below, never behind it.
- Flashing
- Thin sheet material, usually metal or a flexible membrane, that directs water away at openings, roof edges and wall-to-roof joints. Poor flashing is a leading cause of hidden rot, so installation order and direction of laps matter.
- Vapor retarder
- A layer that slows moisture from moving through a wall, floor or ceiling assembly. Where it goes depends on climate and construction, and putting it on the wrong side can trap water inside the framing.
- Rough-in
- The first stage of plumbing, electrical or mechanical work, when pipes, boxes and ducts are placed in open framing before walls are covered. Correct rough-in locations avoid cutting finished surfaces later.
- Trap arm
- The horizontal section of drain between a fixture's trap and the point where it connects to a vent. Its length is limited so the water seal in the trap is not pulled out by flow in the drain.
- Branch circuit
- The wiring between a breaker in the panel and the outlets, lights or equipment it serves. Its wire size and breaker rating are matched so the conductors do not overheat under the load.
- Ground-fault circuit interrupter
- A receptacle or breaker that senses current leaking to ground and cuts power within a fraction of a second. It is required in wet or outdoor locations to reduce the chance of electric shock.
- Combustion air
- Fresh air supplied to a fuel-burning appliance so the fuel burns fully and exhaust leaves through the vent. A tightly sealed house or small closet can starve a furnace or water heater and cause poor combustion.
- Thermal bridging
- Heat flowing through framing members or fasteners that conduct better than the insulation around them. It reduces the real performance of a wall, which is why continuous insulation or advanced framing is used.
- Thinset mortar
- A cement-based adhesive spread in a thin bed with a notched trowel to bond tile to a flat, sound substrate. The notch size and a back-buttered tile influence coverage and long-term adhesion.
- Stair stringer
- The sloped structural member that supports treads and risers. It is laid out so every step has the same rise and the same run, since uneven steps are a trip hazard and a code violation.
- Slab-on-grade
- A concrete floor placed directly on prepared ground, usually with thickened edges that act as the footing. A compacted base and a moisture barrier underneath keep the slab from cracking and from wicking ground moisture.
- Construction waste diversion
- Sending wood, drywall, metal and concrete to recycling or reuse rather than the landfill. California's green building code sets a minimum diversion target, so sorting debris and keeping records are part of planning the job.